Coldingham Public Hall Refurbishment Plans

Plans for the refurbishment of Coldingham Public Hall include the following:

Items shown in blue are the subject of the Peoples Millions Voting Competition.

As winners of the Peoples Millions Runners Up prize everything shown below as subject to funding can now be done. Thank you everyone.

Suspension Truss and Curtaining - To ensure maximum flexibility for the stage area all flats, curtains and lights will be suspended from a metal theatrical truss system suspended from the ceiling at the height of the eves. Curtains and their support tracks will be mounted at the front, mid, rear and sides of the suspension truss.

Sound and Lighting - A production lighting system will be provided within the hall to include an appropriate control system, dimmers, bars, circuits and lights. The operation system chosen for the lighting will require a level of expertise which can be obtained with a minimum of training. A sound system will be provided in the hall which meets basic requirements.

Stage and Tables - A modular stage system will be obtained for the hall, which allows stages to be erected at different heights and in different configurations.

Seating - Ten rows of raked telescopic seating will be fitted. Fully extended this seating will occupy 9.3 metres depth and when fully collapsed will compress into a space of approximately 1.225 metres. The seating will be operated by an electric motor. The seating will extend from the front of the production box to the floor in 10 rows, each of which is divided by a central aisle. A further 2 rows of seats can be added at floor level.

This is a computer generated image

 

Refurbishment of the roof - A physical survey of the hall established the need for major roof repairs. These repairs involved stripping the roof, new sarking, re-felting and re-slating.

Insulation - All windows in the hall have been replaced with double glazed sash and case units, which meet planning, conservation and architectural requirements for a Grade Cs listed building. A suspended ceiling with insulation has been installed above the main wooden roof trusses in the ceiling. These trusses, which are a recognised architectural feature of the hall, have remained visible from below.

Heating - Radiant ceiling panels have been installed to provide the primary source of heating for the hall together with slow ceiling mounted fans which will ensure even distribution of heat by convection.

Kitchen - The kitchen will be fitted with worktops, sinks, wall units and a cooker, meeting required health and hygiene standards for hot and cold food production catering.